Location: Hybrid Business Estate Development
Scope: Site Clearance & Bulk Earthworks
Status: Completed
Project Overview
MWS was appointed to deliver the site clearance and earthworks package for a proposed hybrid business estate at Whistler Drive. The project required the use of GPS-controlled machinery to re-engineer the existing ground and bring the site to formation level, ready for follow-on groundwork operations.
Before Works Began
The site was heavily overgrown and had previously been used as an informal tipping ground. Our team encountered:
- Stockpiles of unidentified and redundant construction materials
- Pools of standing water and poor ground conditions
- Vegetation and scrubland requiring clearance
Our Solution
We carried out a full site strip, stockpiling reusable topsoil and vegetation for proposed landscaped areas. All suitable excavated materials were repurposed as engineered fill to raise low-lying areas of the site, helping to minimise off-site disposal. Any surplus or unsuitable waste was safely removed and disposed of at a licensed tip.
Using advanced GPS grade-control equipment, we were able to deliver precise formation levels across the site—ensuring the incoming groundworks teams could proceed without delay or rework.
Outcome & Benefits
✔ Accurate formation levels delivered using GPS technology
✔ Reduced waste disposal costs through intelligent material reuse
✔ Site fully cleared, re-profiled, and construction-ready
✔ Delivered cost-saving alternatives without compromising quality