Date: April 2025
Scope: Concrete Works
Status: Completed
Project Overview
Installation of a concrete road and turning circle for articulated wagons on a Water Treatment Works.
MWS Contracts secured the full concrete package, from road excavation, stone installation and the pouring of over 60cu of concrete.
Once stone was compacted and trimmed in place road forms were pinned in place and set to finished heights using a Dual grade laser.
On each individual pour, reinforced steel mesh was placed and secured in preparation for the ST4 concrete.
We used a roller screed to help level the concrete, with a trowel edge and brush finish on all concrete pads.